a. Water Supply
Networks
- Extension of Athens water
supply network to the towns of Corinthos, Loutraki, Aghii Theodori and Kinetta (40
km pipelines, water tanks, pumping station. Design
population 100.000).
- Water supply networks for the
Municipality of Preveza (Design population : 30.000).
- Water supply network for the
towns of Karistos and Psachna.
- Water supply network for Saronis, suburb of Athens.
- Water supply network for the Preveza industrial area.
- Water supply network for the Ierapetra industrial area
|
b. Wastewater Networks
and Treatment Plans
- Wastewater collection systems
for parts of Athens major region.
- Wastewater collection system
and municipal wastewater treatment plant for the Municipality of Ellomenos
, Lefkada (20.000 design population).
- Wastewater treatment plant
for the Municipality of Kyparissia , Peloponnese (16.000 design population).
- Industrial wastewater
treatment plant for the Larissa industrial area.
- Industrial wastewater
treatment plant for the Komotini industrial
area.
- Sewage network for the Preveza industrial area.
- Sewage network for the Ierapetra industrial area.
|
c. Dams and Reservoirs
- Tanos dam
(52 m height), Peloponnese.
- Deskati dam
(30 m height), North Greece.
- Chalavrianos dam
(30 m height), Crete.
- Seven artificial reservoirs,
of 1.000.000 m3 each, in Central and South Peloponnese.
|
d.
Flood Control and River Improvement Works
- River Improvement Works for
part of Kifissos river
(4 km), in Athens major region.
- River Improvement Works for Tolophona river, Prefecture
of Phokida.
|
e. Reclamation Works
- Irrigation network at Korrisos and Lithia, Kastoria
Prefecture , N. Greece (6.000 stremmas).
- Drainage network of Tolophona region.
|
f.
Water Resources Management and Hydrological Studies
- Technicoeconomic
study for the adjustment and upgrading of the hydrologic network of the Greek
Ministry of Public Works.
- Various hydrological studies
for flood protection projects.
|
g.
Highway and railway drainage and flood protection
- Drainage and flood protection
works for the Athens - Thessaloniki highway (Section :
Scarfia - Thermopyles,
total length : 17 km).
- Drainage and flood protection
works for the new railway line, connecting the SOVEL factory to the
Central Greece railway network (length : 36
km).
- Drainage and flood protection
works for the upgrading of the existing railway line from Thessaloniki
to Promachona (total length: 40 km).
- Drainage
and flood protection works for the construction of Marconi – Agias Annas street from Athinon Avenue up to Makrigianni
– Tavrou street, Profiti Daniil street
(from Iera Odos to Kiffisos River) and widening of Orfeos
street in the section between Profitis Daniil street and Agias Annas street.
|
h. Fire fighting networks
- Firefighting network for the
Municipality of Philothei , Athens , Greece.
|